head_banner

cryolipolysis to shape figure

cryolipolysis to shape figure

Short Description:

Insert the funnel into the overflow hole, insert the air nozzle connector into the drain hole, and the water in the instrument will automatically flow out.


Product Detail

Product Tags

How to change the water? Drain the water before changing the water.Drainage Method of draining water:Insert the funnel into the overflow hole, insert the air nozzle connector into the drain hole, and the water in the instrument will automatically flow out. After the water is completely drained, operate it according to the method of adding water.
0c98dc49

If the frozen head is found to be hot within 5 minutes before the new machine is turned on for the first time (the air in the handle causes the water flow to not circulate), please stop working immediately and wait for the water to circulate to the handle and the freezing head before starting to work. If the handle is still hot , Please contact the relevant personnel immediately, remember not to start without water.
GDFS
hfg

Effect

duibi1 (3)

duibi1 (4)

duibi1 (5)

duibi1 (2)

duibi1 (1)


  • Previous:
  • Next:

  • Write your message here and send it to us